Scion 2007 tC User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
SCION tC 2007 SUPERCHARGER
Procedure
Page 11 of 36
Issue A: 04/10/07
(o)
With a suitable ink pen, mark Battery cable
approximately 6 to 7 inches from post terminal
end of cable (Arrows). This will be the new
location of the OE cable retainer. See Fig 26
and Fig 27.
(p)
Remove OE cable retainer. Install TRD
supplied cable retainer at new location (Arrow)
as shown in Fig 27.
(q)
Temporarily unbolt OE Fuse Box and drill out
3 OE mounting holes using a ½” diameter drill
bit. NOTE: You may need another person to
hold fuse box while you drill out the 3 holes.
This operation is to allow the fuse box to be
mounted slightly forward of it’s OE position so
that there will be room for the larger TRD
airbox. See Fig 28, Fig 29, and Fig 30.
Fi
g
. 26
Fi
g
. 27
Fi
g
. 28
Fi
g
. 29
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 35 36

Comments to this Manuals

No comments